Solar panel roof in the Philippines: what each kind of roof changes
The short answer: a roof can carry panels. Whether yours can depends on the sheet and the structure under the covering, and a survey checks both before any panel goes on.
The useful question is what your roof changes about the job: how the panels are fixed, how long the crew is up there, and what has to be made good when they come down.
By Hamza Rivera, updated
Short answer: Almost every roof around here can carry a solar array. What the roof changes is how the panels are fixed, how long the crew is up there and what is made good afterward. On corrugated GI sheet the panels clamp to the ribs or bolt into the purlins beneath, and a standing seam roof takes clamps on the seam with no drilling.
The roofs around here, and what each one means for the fixing
The fixing depends on what is under the covering.
- Corrugated or rib-type GI sheet Sheet metal laid over purlins
- Panels are fixed through the sheet into the purlins underneath, so the steel beneath the sheet is what carries them and its spacing is what decides the fixing. A surveyor checks the purlins from underneath.
- Standing seam metal A metal roof with raised seams
- Ask the installer how the mounts attach to this profile before ordering, since the panel manual ties mounting to the roof structure.
- Concrete deck Flat roofs and roof decks
- No pitch to work with, so the array sits on a frame that is set to an angle. That frame adds weight, and the roof has to take it.
- Clay or concrete tile A pitched roof with clay or concrete tiles
- Mounts on a tile roof mean working around the tiles, so ask the installer how they plan to do it before anybody starts.
What somebody is actually looking at on the survey
Five things, and several need the roof or the space under it to judge. None of them needs you to measure anything yourself; they are here because each one is a reason a job gets moved, and finding out early is the cheap version.
- What is under the sheet
- Purlin size, spacing and condition carry the array. This decides whether a roof takes panels as it stands, and it cannot be judged from a photo of the outside.
- Which way the slope faces
- Each facing catches the sun at a different time of day. A roof with two usable slopes can spread the output across more of the day, because the morning and afternoon do not arrive together.
- What shades it, and when
- A neighbor’s wall, a water tank, a mango tree, the new second story next door. Shade on a panel cuts its output, at whatever hour it falls.
- How old the roof is
- If the roof is near the end of its life, check it before the panels go on.
- How anybody gets up there
- Access decides the working method and the safety arrangements, and on a tight lot it can decide whether the job is done from the roof or from a lift.
If the roof is tired, the roof goes first
An array may outlast the sheet it is bolted to. Put panels on a roof that has a few years left and you pay to take them off, pay for the roofing, then pay to put them back. That repeat cost is the one to avoid.
So it gets said at the survey, before anything is ordered. It is also the reason the survey spends its time on the underside of the roof.
Do not drill, fix into the roof or walk it to check it yourself. Roof work at height is a fall risk, and the survey is done by people with the right gear. A flat concrete deck that takes a ballasted frame needs a structural check of the slab before any weight goes on it.
What a home installation involves
What people ask about panels and roofs
What type of roof is best for solar panels?
The manuals say the roof structure and its fire rating decide whether a roof can carry panels, so ask the installer to check both before choosing a roof type.
What changes between roof types is the mounting method, the time on site and what has to be made good afterwards.
Do I need a permit to put solar panels on my roof?
For a connected or zero-export system, yes. Section 301 of the Implementing Rules of the National Building Code says no one may alter a building or structure without first getting a building permit from the Building Official. The DOE circular DC2026-08-0017 asks for a building permit from the local government for these systems too, and a written notice to your distribution utility for a connected system.
The local government can accept a building permit you already hold if it confirms that permit covers the work, and then you give them a copy. Micro-solar systems, the plug-in kind up to 1 kW, need no building permit under that circular. Installing without a permit can carry a surcharge of 100 percent of the building fees under Section 212 of the same rules.
Can solar panels be installed on any roof?
The answer turns on the frame underneath. Panels are carried by the purlins or the slab under the surface, so a roof can look sound and still have tired steel underneath.
A roof near the end of its life, or one nobody can safely work on, is worth checking before anything is ordered.
Do solar panels damage the roof?
Not when the penetrations are made and sealed properly, and the roof is checked after the work.
Damage can come from fixing into something not meant to carry a load, which is why the survey checks underneath first.
Is a solar type roof the same as a roof with solar panels?
No. This page is about a roof with panels fitted to it.
This page is about putting panels on a roof you already have. If you came for the house design, it is not here.
How long do solar panels last on a roof?
Check the panel warranty against the age of the roof before ordering, because the two may have different remaining lives.
We will say so at the survey if we think the roof should come first.
Send a photo of the roof and the town it is in
A picture of the roof and the outside of the house tells us most of it, and the rest comes from the survey. You will get a written answer with what your roof changes about the job.
Tell us the property and what you are trying to cut, and you will get a written answer with a size and a next step. No visit is booked and nothing is charged for asking.